Deck builders in Tualatin
Tualatin spells out the answer to a question many deck owners ask: can I just replace the boards? Yes, without a permit, as long as only the decking is replaced. Seven in ten Tualatin homes were built between 1970 and 1999. Tell us about your Tualatin deck project to get a free quote.
Repairs: what needs a permit
The City of Tualatin’s Building Division puts the line here:
“A permit is required if it involves the replacement of joists, beams, railings, or stairs. A permit is not necessary if only the decking (top) is being replaced.”
The same FAQ adds two material notes for that work: decking should be at least 5/4-inch nominal lumber, because 3/4-inch lumber is not structurally graded or approved for decks, and stair treads must be at least 2x material. If taking up the old boards shows joists or beams that need replacing, the job needs a permit after all; see deck repair and replacement for what to look for.
New decks: the permit line and the steps before it
Tualatin words the exemption this way: permits are not required for porches and decks “where the floor or deck is not more than 30” above adjacent grade at any point,” and, for a covered porch, where “the covered portion of the porch does not come closer than 3’ to property lines.” A deck above 30 inches needs a building permit, and the City’s residential permit steps put three reviews ahead of it:
- Clean Water Services. “If your project impacts/covers any additional ground in any way (addition, deck, slab, patio, bump out, etc), Clean Water Services needs to approve your project.” The online pre-screen is free and typically takes 5 to 7 business days, and a copy of the approval is required before building permits are issued.
- Engineering. The Engineering Division must also sign off on projects that cover additional ground, which the City says include “decks that require a building permit.”
- Planning. Planning signs off on exterior changes visible from outside the structure. Ask Planning (503-691-3026) whether your deck counts.
Plans, site plans and tall decks
For a deck attached to the house, the City says its Typical Deck Details can be used in place of drawn deck plans if the deck meets them, followed “without any deviation.” The version we found is dated 2008, so ask the Building Division which edition it accepts today. Either way, “A site plan will still be required so we can check setbacks and location.” The site plan must be to scale and show all structures, driveways, graveled areas, patios and other impervious surfaces, plus easements, property lines and “the exact distances from the proposed deck to the property lines.”
The City’s FAQ also lists decks and patio covers over 10 feet in height, and sloping sites, among the special conditions that call for an architect or engineer on a single-family project.
Who issues the permit
The City of Tualatin Building Division, 10699 SW Herman Road, Tualatin, OR 97062 (503-691-3044). Inspections are requested at 503-691-3040, including the final inspection on a residential deck once all work is complete. Hours are Monday through Friday, 8 a.m. to 5 p.m., and permits are not issued after 4 p.m.
Tualatin homes
Tualatin’s median home was built in 1992, according to the Census Bureau’s 2020-2024 American Community Survey. The 1990s are the largest decade, at 30.0 percent of homes, and 71.9 percent were built between 1970 and 1999. Of occupied homes, 55.1 percent are owner-occupied, and 50.5 percent of all homes are single-family detached houses.
Planning a Tualatin deck
Compare Tualatin with the rest of the metro in our deck permit rules, and see what a deck costs for the most recent published Portland-area figures. If you are replacing boards, our guide to the best decking for Portland’s climate compares the options, and deck stairs code covers rebuilt stairs. For Portland itself, see our Portland deck builders page.
Tualatin at a glance
- Replacing only the decking needs no permit; replacing joists, beams, railings or stairs does.
- Clean Water Services approval and Engineering sign-off come before a permit for a deck that covers new ground.
- The City accepts its Typical Deck Details in place of drawn plans, with a site plan showing distances to property lines.
- Median home built in 1992; 71.9% built between 1970 and 1999 (ACS 2020-2024).
Covers Tualatin, OR and surrounding Washington County addresses (97062).
Available in Tualatin: Deck Repair & ReplacementComposite DecksCovered Decks
Deck work in Tualatin
Deck Repair & Replacement
Soft boards, loose railings or a deck past saving: repairs, re-decking and full replacements.
Composite Decks
Composite, capped composite and PVC boards on a new deck or a sound existing frame, with long manufacturer warranties.
Covered Decks
Add a roof over your deck. Attached covers and freestanding structures, plus the permits Oregon requires.
How it works
Describe the project
Answer a few questions about the deck: a new one, a repair or replacement, composite boards or a cover.
We follow up
We get back to you by phone, text or email to talk through the deck, the site and your timing.
Get your free quote
The quote is free and comes with no obligation. Whether you go ahead is entirely up to you.
Get a Free Quote
Tell us about your deck project and get a free, no-obligation quote.
Tualatin deck questions
Do I need a permit to replace my deck boards in Tualatin?
Not if only the decking is replaced. The City of Tualatin says a permit is not necessary if only the decking (the top) is being replaced, but a permit is required if the work involves replacing joists, beams, railings or stairs.
When does a deck need a permit in Tualatin?
The City says permits are not required for porches and decks where the floor or deck is not more than 30 inches above adjacent grade at any point, and, for a covered porch, where the covered portion comes no closer than 3 feet to the property lines. Above that, a building permit is needed, and the City lists Clean Water Services approval and Engineering sign-off among the steps before it is issued.